Thingley, Rodbourne and Christian Malford
13th August 2009

Around the Chippenham area getting the Thingley-Topsham rail recovery set and the Loadhaul Tug on the Theale tanks

<-- Index | Showing 1-14 of 14 pictures | Index -->
A rake of OBAs and OCAs alongside the Mk1s being broken up at Thingley. Of interest is the fact that the OBAs have been fitted with mesh sides
A rake of OBAs and OCAs alongside the Mk1s being broken up at Thingley. Of interest is the fact that the OBAs have been fitted with mesh sides
2009-08-13 14:02:53
The driver gives 43144's windscreen a wash as it heads past Thingley
The driver gives 43144's windscreen a wash as it heads past Thingley
2009-08-13 14:11:43
43129 about to slow for the Chippenham stop
43129 about to slow for the Chippenham stop
2009-08-13 14:19:53
60059 passes Rodbourne on 6B33 Theale-Robeston empty tanks
60059 passes Rodbourne on 6B33 Theale-Robeston empty tanks
2009-08-13 15:26:48
66153 shunting its train in Thingley yard
66153 shunting its train in Thingley yard
2009-08-13 16:24:17
An HST slows for Chippenham at Langley Burrell
An HST slows for Chippenham at Langley Burrell
2009-08-13 16:59:03
66153 leads 6W66 Thingley-Topsham via Swindon Rail Recovery Train past Langley Burrell on its way to Swindon to cross over to the down line
66153 leads 6W66 Thingley-Topsham via Swindon Rail Recovery Train past Langley Burrell on its way to Swindon to cross over to the down line
2009-08-13 17:02:36
66184 tails 6W66 Thingley-Topsham via Swindon Rail Recovery Train past Langley Burrell on its way to Swindon to cross over to the down line
66184 tails 6W66 Thingley-Topsham via Swindon Rail Recovery Train past Langley Burrell on its way to Swindon to cross over to the down line
2009-08-13 17:02:47
Paddington bound HST clagging well as it powers along the bank at Christian Malford
Paddington bound HST clagging well as it powers along the bank at Christian Malford
2009-08-13 18:05:49
43041 heads for Chippenham at Christian Malford
43041 heads for Chippenham at Christian Malford
2009-08-13 18:07:06
43041 heads for Chippenham at Christian Malford
43041 heads for Chippenham at Christian Malford
2009-08-13 18:07:09
66184 leads 66153 past Christian Malford on 6W66 Thingley-Topsham. The train had to run to Swindon to change lines and direction because both Thingley yard and the Melksham line to Westbury are only accessable for trains heading in the down direction
66184 leads 66153 past Christian Malford on 6W66 Thingley-Topsham. The train had to run to Swindon to change lines and direction because both Thingley yard and the Melksham line to Westbury are only accessable for trains heading in the down direction
2009-08-13 18:16:07
66184 leads 66153 past Christian Malford on 6W66 Thingley-Topsham. The train had to run to Swindon to change lines and direction because both Thingley yard and the Melksham line to Westbury are only accessable for trains heading in the down direction
66184 leads 66153 past Christian Malford on 6W66 Thingley-Topsham. The train had to run to Swindon to change lines and direction because both Thingley yard and the Melksham line to Westbury are only accessable for trains heading in the down direction
2009-08-13 18:16:12
66184 at Christian Malford
66184 at Christian Malford
2009-08-13 18:16:14